I have mentioned before that there was a construction project going on, on Shore Road for 4 or 5 months. They were doing "horizontal boring" where they dig a hole in the street and then maybe 1200 feet away, dig another hole, and then angle a drill down into the first hole, and the drill goes down about 8 feet, and then straightens out and bores a horizontal hole until it gets to the second hole, 1600 feet away! It is an astounding process, and I was fascinated to watch it for months on end. I will do a blog post about it one day. Well, now the project is done but the plastic orange barrels are still in the street, taking up one lane and there is a lighted arrow to let people know they have to move over. I like that late in the day, the only thing that really shows is the arrow. I just think it's a strange scene.
Saturday, March 6, 2021
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment